On November 26, Liao Jiasheng, Chairman of the Group, met with Viktor Khmarin, Chairman of the Management Board and General Director of RusHydro, at the Group’s headquarters for in-depth discussions on advancing practical cooperation.
On November 21 local time, CGC successfully signed the contract for the Seboche Road upgrade project in Lesotho. The project is located in Butha-Buthe District and covers approximately 9.5 kilometers. It will be undertaken by CGC Southern Africa Branch.
On the afternoon of November 21, 2025 local time, CGC and the National Directorate of Water (DNA) of Mozambique formally signed the cooperation agreement for the Mulotana Water Supply Project in Maputo Province.
Recently, People.cn reported on CECEP Solar’s innovative practice in agricultural irrigation in Ghana—the photovoltaic irrigation system project.
On the afternoon of September 1st local time, the Embassy of the People’s Republic of China in the Kingdom of Saudi Arabia hosted the “September 1st: First Lesson of the Semester” event in Riyadh.
Recently, as part of the Gen Z Foreign Influencers Explore Hefei event, organized by the Hefei Cyberspace Affairs Office, hosted by China Daily Information Co, and supported by Hefei Television, five foreign content creators from the United States, France, Canada and Yemen visited CECEP Guozhen’s Hudaying Water Reclamation Plant.
On September 2, the 8th meeting of the China-Kazakhstan Entrepreneurs Committee was held in Beijing. Ding Xuexiang, Vice Premier of the State Council, and Kassym-Jomart Tokayev, President of the Republic of Kazakhstan, attended the opening ceremony and delivered remarks.
On August 31, CECEP Solar’s 500 MW photovoltaic project integrating desertification control in Dalad Banner was successfully connected to the grid, becoming the first project in the Inner Mongolia Autonomous Region to simultaneously advance renewable energy development and ecological restoration.
第  19  /  34  页  总条数: 167
Produced By CMS 网站群内容管理系统 publishdate:2026-04-08 11:04:27