On the afternoon of June 10, Liao Jiasheng, Chairman of CECEP, visited Tongji University and held a working meeting with Yang Jinlong, President of Tongji University.
Recently, CECEP’s first Wind Power + Rural Revitalization project—the CECEP Song County Jiugao Town Wind Farm Project—was successfully connected to the grid.
On June 3, CGC successfully signed the design-and-build contract for the CHIPATA–LUNDAZI section of the M12 Road in Zambia’s Eastern Province.
On March 15, the project team of CQEC’s Chittagong Medical College project in Bangladesh, together with the affiliated hospital of the college, organized a free medical consultation event themed “Caring for the Frontline, Safeguarding Health”, delivering professional medical services and health support to frontline construction workers.
On March 13, CCTV-13 News 30’ reported that the 110-ton-class Liqing-2 pintle liquid oxygen–kerosene engine, independently developed by CAS Space, successfully completed a long-duration test run.
Recently, the Energy Bureau of the Inner Mongolia Autonomous Region released the first batch list of independent new-type energy storage construction projects for 2026.
Recently, Valiant Pharmaceutical’s first active pharmaceutical ingredient (API), olmesartan medoxomil, successfully passed the rigorous review of the European Directorate for the Quality of Medicines and HealthCare (EDQM) and obtained the Certificate of Suitability to the European Pharmacopoeia (CEP), supported by its advanced and independently developed research and production process.
On March 12, Liao Jiasheng, Chairman of CECEP, met with Zeng Yuqun, Chairman and CEO of CATL, and his delegation at CECEP headquarters.
第  23  /  55  页  总条数: 272
Produced By CMS 网站群内容管理系统 publishdate:2026-10-16 10:41:43