On March 20, CECEP held the first session of the 2026 CECEP Lecture Series, inviting Zhang Yuxian, former Director of the Economic Forecasting Department of the State Information Center and a member of the expert committee for the 14th and 15th Five-Year Plans, to deliver a special lecture.
On March 20, Liao Jiasheng, Chairman of CECEP, met with Xin Junfeng, Secretary of the Song County Party Committee of Luoyang, Henan Province, and his delegation at the CECEP headquarters.
On March 15, the project team of CQEC’s Chittagong Medical College project in Bangladesh, together with the affiliated hospital of the college, organized a free medical consultation event themed “Caring for the Frontline, Safeguarding Health”, delivering professional medical services and health support to frontline construction workers.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On October 10, Liao Jiasheng, Chairman of CECEP, met with Wangdui, Vice Chairman and General Manager of Xizang State-Owned Capital Investment and Operation Co., Ltd., at CECEP headquarters.
Recently, the first hospital outpatient facility in China built using a Modular Integrated Construction (MIC) system, designed by the Shenzhen Machinery Institute Architectural Design under CQEC, was officially completed and put into operation at the original site of Shenzhen Longhua District Central Hospital.
Recently, CECEP Solar stood out among 58 participating companies in the 2025 Chongqing ESG Pioneer Enterprise Selection campaign and was named a Chongqing ESG Pioneer Enterprise.
Recently, Wind, a leading domestic ESG (Environmental, Social and Governance) rating agency, released its 2025 results, recognizing CECEP Guozhen’s outstanding ESG performance with an upgraded AA rating — a historic leap of two levels.
第  37  /  55  页  总条数: 272
Produced By CMS 网站群内容管理系统 publishdate:2026-10-16 10:41:49